Abstract

CV. Berlian Abadi is a manufacturing industry company that produces roof tiles and paving. Currently, the company often experiences a shortage of raw materials, resulting in a delay in the production process. This problem causes very large inventory costs. The purpose of this study is to find the most optimal method for the company with the calculation of "Material Requirement Planning (MRP)", to find out the amount of safety stock, reorder point and to plan raw material inventory. Based on the calculation using the selected method, at the demand forecasting stage the selected method for roof tiles and paving is the Exponential Smoothing a = 0.9 method while in aggregate planning the selected strategy is Level Strategy with a total cost of Rp. 187,200,000. In the Material Requirement Planning (MRP) method with the lot sizing technique, it is known that the cement item uses the Economic Order Quantity lot sizing method with a total cost of Rp. 284,897,300, sand uses the Economic Order Quantity lot sizing method with a total cost of Rp. 62,866,107. From the research results, it was found that the smallest total cost of inventory was Rp. 347,763,407..

 

CV. Berlian Abadi merupakan perusahaan industri manufaktur yang memproduksi genteng dan paving. Saat ini perusahaan sering mengalami kekurangan bahan baku sehingga mengakibatkan terhambatnya proses produksi. Dari permasalahan tersebut menimbulkan biaya persediaan yang sangat besar. Tujuan dari penelitian ini untuk mencari metode yang paling optimal untuk perusahaan dengan perhitungan ‘’Material Requirement Planning (MRP)’’, mengetahui jumlah dari safety stock, reorder point serta merencanaakan persediaan bahan baku. Berdasarkan perhitungan menggunakan metode yang dipilih, pada tahapan peramalan permintaan metode yang terpilih untuk genteng dan paving adalah metode Exponential Smoothing a=0,9 sedangkan pada perencanaan agregat strategi yang terpilih adalah Level Strategy dengan total biaya yaitu Rp. 187.200.000. Pada metode Material Requirement Planning (MRP) dengan teknik lot sizing diketahui bahwa item semen menggunakan metode lot sizing Economic Order Quantity dengan total biaya yaitu Rp.284.897.300, pasir menggunakan metode lot sizing Economic Order Quantity dengan total biaya yaitu Rp. 62.866.107. Dari hasil penelitian didapatlan bahwa total biaya yang paling kecil persediaam adalah sebesar Rp. 347.763.407.

Downloads

Download data is not yet available.

References

Ahmad Muhsin. 2017. Analisis Pengendalian Persediaan Bahan Baku dengan Metode Economic Order Quantity dan Kanban pada PT. Adyawinsa Stamping Industrie. Yogyakarta

Asvin Wahyuni. 2015. Perencanaan Persediaan Bahan Baku Dengan Menggunakan Metode Material Requiremens Planning (MRP) Pada Produk Kacang Sanghai Pada Perusahaan Gangstar Ngunut

Erik P, (2010) Skripsi, Perencanaan dan Pengendalian Produksi Semen dengan Menggunakan Metode Aggregate Planning di PT. Semen Gresik

Fuad Ath. (2011). Skripsi, Perencanaan Persediaan Bahan Baku Gelondongan dengan Metode Silver Meal (Studi Kasus Pada PT.Gamedia Pustaka Utama, Jakarta (http://rayfel.files.worppres.com/2012/07/bab-iii-peramalan.pdf)

Irwansyah, D. Ery (2010), Penerapan Material Requirements Planning (MRP) Dalam Perencanaan Persediaan Bahan Baku Jamu Sehat Perkasa Pada PT. Nyonya Mener Semarang Skripsi, Semarang: Universitas Deponegoro. (http://eprints.undip.ac.id/22697/1/skripsi.pdf.2010

Jurnal, Agil Handoko dan Nia Budi P, Perencanaan Persediaan Bahan Baku Menggunakan Metode Material Requirements Planning (MRP) Pada PT. Pardic Jaya Chemical

Jurnal, Farieq Afzal Z, Analisis Pengendalian Persediaan Bahan Baku dengan Metode Material Requirements Planning Pada PT. Tirta Purbalingga Adijaya Sentul

Jurnal Sinergi (Volume 13 No 4 Oktober 2009) Indra Almandi,Thomas Akbar Yanis. Penunjang MRP dan JIT.Universitas Mercu Buana Jakarta

Kukuh Anggara Martha. 2018. Analisis Material Requirements Planning Produk Coconut Sugar pada Kul-Kul Farm.Bali

Muamar Renaldi Lizama .2019. Analisis Pengendalian dan Perencanaan Bahan Baku Batu Bata dengan Metode Material Requiremens Planning (MRP). Palembang

Siti Z.U, Adi.I, Retno.K (2020) Jurnal Analisis Pengendalian Persediaan Bahan Baku dengan Menggunakan Metode Material Requirements Planning (MRP)

Wahyu Purnama A (2018) Jurnal, Perencanaan Persediaan Bahan Baku Wajan dengan Metode MRP (Material Requirements Planning) Pada Perusahaan Cor Aluminium Bintang Dua di kec. Cikoneng Kab. Ciamis

Yuanita Aritantia (2018) Skripsi, Perencanaan Persediaan Material Berdasarkan Integrasi Distribution Requirement Planning dan Material Requirement Planning Pada PT

Downloads

Published

2024-07-26

Issue

Section

Articles